Design with experience, complete with safety
Korean precision machinery logistics service has started in 1996, and in 1999, first one-stop logistics service between Korea-Japan has launched and the developers of the process and the operation staffs are now in H&P Logis Inc. to provide a better service to its valuable customers aiming to upgrade its’ logistics service as a globally professional, differentiated logistics service with the state-of-the-art equipment and experts.
H&P Logis Japan Inc. is made of professionals in every sector of its’ logistics service from the site of facility carry out to the destination site with the Isothermal-Humidity Controllable Container and vibration-free system to minimize harm from the external influences and reduce clients’ cost of packaging facilities.









| Type | Length*Width*Height(m) | Qty | Weight(kg) | MAX.PAYLOAD(kg) | MAX.GROSS WEIHT(kg) | Remarks |
|---|---|---|---|---|---|---|
| A | 9.4×3.6×3.2 (inside : 9.17×3.37×2.85) |
5 | 10,500 | 20,000 | 30,500 | |
| B | 9.4×3.4×3.2 (inside : 9.17×3.24×2.85) |
8 | 10,100 | 20,000 | 30,100 | |
| C | 9.4×3.0×3.2 (inside : 9.17×2.78×2.85) |
45 | 9,300 | 20,000 | 29,300 | |
| C2 | 9.78×3.0×3.2 (inside : 9.18×2.85×2.94) |
40 | 8,500 | 21,980 | 30,480 | |
| D | 9.4×3.4×3.9 (inside : 9.17×3.18×3.45) |
2 | 10,600 | 20,000 | 30,600 | |
| AA | 9.78×3.6×3.2 (inside : 9.18×3.47×2.94) |
10 | 9,200 | 21,280 | 30,480 | |
| BB | 9.78×3.4×3.3 (inside : 9.18×3.27×3.04) |
25 | 8,900 | 21,580 | 30,480 | |
| BBB | 9.78×3.6×3.0 (inside : 9.18×3.47×3.04) |
5 | 9,200 | 21,280 | 30,480 | |
| CC | 9.78×3.0×3.3 (inside : 9.18×2.87×3.04) |
55 | 8,500 | 21,980 | 30,480 | |
| DD | 9.78×3.4×3.9 (inside : 9.2×3.27×3.64) |
5 | 9,500 | 20,980 | 30,480 | |
| EX | 7.0×3.4×4.5 (inside : 6.6×4.2×4.2) |
2 | 10,100 | 20,000 | 30,100 | Extendable |
| E | 6.3×3.39×3.73 (inside : 5.743×3.255×3.51) |
1 | 6,500 | 24,000 | 30,480 |
* Temperature setting range
-40℃ ~ +30℃(-31℉ ~ +86℉)
* AFAM+ System
By using an advanced microprocessor operating air management system with placing ventilation door at the optimal spot so that we can cool down product’s temperature duration up to 72 hrs. (with hourly controllable management)


